Methodology verified 22 June 2026DfE SEMSPSDS Phase 4Ofgem Q3 2026 cap (gas 7.33p / elec 26.11p)
framework / Pagabo

Pagabo for school decarbonisation

Author: Oliver Wakefield-Smith, Founder Digital Signet. Reviewed against DfE Sustainability Strategy (Mar 2025) and Education Estates Strategy (Feb 2026). Verified 22 June 2026.

Pagabo operates major works frameworks that include school decarbonisation as a use case. The Refit framework and the Major Works framework both carry suitable lots for ASHP and fabric retrofit.

Pagabo frameworks for schools in 2026

Pagabo operates major works frameworks that include school decarbonisation as a use case. The Refit framework and the Major Works framework both carry suitable lots for ASHP and fabric retrofit.

Single-school ASHP lot structure

A single-school ASHP retrofit typically sits in the Refit lot, with a Tier 1 contractor managing design and build. The lot's supplier list is published on Pagabo's site.

Fee structure vs LHC

Pagabo and LHC charge broadly similar framework fees (in the 1 to 2 per cent range). Pagabo's geographic reach is national; LHC operates regional consortia.

PSDS Phase 4 deadlines

Pagabo award routes (mini-competition vs direct award) commonly fit inside the PSDS Phase 4 programme plan, provided the buyer starts the framework process at least 4 to 6 months before construction start.

Related
Sources cited on this page
  1. [S12]Pagabo
Prepared by schoolnetzero.co.uk, 22 June 2026.Page: frameworks-pagaboAuthor: Oliver Wakefield-Smith, Founder Digital Signet.