Methodology verified 22 June 2026DfE SEMSPSDS Phase 4Ofgem Q3 2026 cap (gas 7.33p / elec 26.11p)
case study / Passivhaus primary

Hackbridge Primary Passivhaus

Author: Oliver Wakefield-Smith, Founder Digital Signet. Reviewed against DfE Sustainability Strategy (Mar 2025) and Education Estates Strategy (Feb 2026). Verified 22 June 2026.

Hackbridge Primary (Sutton) was completed as one of the UK's first Passivhaus-certified primary schools. Published outturn capital costs commonly cited in Passivhaus Trust case-study material sit in the £2,000 to £2,400 per m2 range for the period, indexed to 2026 prices.

Verified outturn £ per m2

Hackbridge Primary (Sutton) was completed as one of the UK's first Passivhaus-certified primary schools. Published outturn capital costs commonly cited in Passivhaus Trust case-study material sit in the £2,000 to £2,400 per m2 range for the period, indexed to 2026 prices.

Fabric and MVHR specifications

External-wall U-value below 0.15 W/m2K, roof below 0.10, triple-glazed windows around 0.85, airtightness target below 0.6 ACH at 50 Pa, MVHR with greater than 85 per cent heat recovery.

Passivhaus uplift vs baseline new-build

Published Passivhaus Trust comparators place the Passivhaus capital uplift at 5 to 15 per cent over an equivalent baseline new-build, recovered in lifetime running costs.

In-use energy data

Hackbridge's published in-use heating demand is materially below DfE benchmark for primary schools, validating the design-day calculation. Detailed monitoring data is in Passivhaus Trust case studies.

Related
Sources cited on this page
  1. [S20]Passivhaus Trust
Prepared by schoolnetzero.co.uk, 22 June 2026.Page: case-studies-hackbridge-passivhausAuthor: Oliver Wakefield-Smith, Founder Digital Signet.